Wednesday, June 23, 2010

Crossed Swords And Palm Tree Pendant

Ferrovia Roma-Viterbo, Monday 28 Labaro station closes. Bus transfer to La Celsa

part of the modernization and strengthening of the urban part of the regional railway Roma-Civita Castellana-Viterbo, run by ATAC, the station next Monday Banner will be closed for refurbishment. Until the end of the work, which is expected to last about three months, the trains will pass without fermarsi.Contemporaneamente, there will be a shuttle bus service between the station and the Banner of La Celsa. The bus connection between the two stations will operate on weekdays except Saturdays, from 6 to 20, with departures every fifteen minutes. By Banner, moreover, it can reach the station of Saxa Rubra using regular lines 039 and 200D, working every day. The shuttle
"Banner-La Celsa" will be a circular one in front of the terminal station Banner. Will cover the Flaminia, stopping: Banner near the station, before the intersection between the Flaminia and Via Silvio Testa and after the intersection of Via Flaminia and Via del Banner.
The modernization work on the urban section of interest to all railway stations between Piazzale Flaminio and Montebello and were financed by the Lazio Region with a total investment of 60 million €. Assistance under the plan covers the docks, stairs furniture and other services and has already been made to Euclid, Water Sorrel, Monte Antenne, Tor di Quinto, Grottarossa, Saxa Rubra, La Celsa, The Giustiniana and Montebello, are underway to Sports Fields (the station is closed and will reopen in autumn). They have yet to start work stations instead of two bridges and Centro Rai. At Piazzale Flaminio, however, is expected to double track and the construction of an underground station which will improve the connection to the line of the metro.

0 comments:

Post a Comment