Friday, November 27, 2009

How To Jump Start A Model A Ford Positive Ground

METRO 'B', FROM 80 MILLION INVESTMENT

(Adnkronos) - Eight new trains, upgrading and cooling of those already 'in the service, and a plan for maintenance. These are the stated objectives of 'Operation innovation "that will deal with' the underground line B in Rome Rebibbia-Laurentina, presented today on the premises of Metro Eur with the presence of Transport of the Municipality of Rome and Sergio Marchi President of Metro, Roberto Grappelli. An investment of € 80 million that will allow 'during the month of December, to bring into service on the tracks of the line, the first "speed trains' air-conditioned, built by Spain's Caf, and similar to those in service on the line . In total, the summer will be eight convoys will replace the old cabins, which, little by little, will be refurbished by the workshop group.

for next summer is expected to almost fifty percent of the fleet will travel 'rush hour will be' equipped with air conditioning. So "no more 'mineral water stations," as stated by the president of Metro Roberto Grappelli, commenting on the plan implemented this summer to meet the passenger suffocated by "tunnel sauna" and "hot trains." The program provides for the restructuring of the convoys expenditure amounted to € 581mila per train. In the project, and also 'planned restructuring of seven arrows of the Sea, serving on the regional railway Roma-Lido.
Another chapter
provided by the project and 'one dedicated to the dignity of trains and stations. To overcome the problem of graffiti on trains and 'was in fact provided an anti-graffiti treatment, a film wrap' the carriages, and that will allow 'to renovate and a more' simple frame of the train simply removing the cover soiled. So coaches "clean" stations but no writing. After intrevento extra cleaning done in recent days by the team "anti-vandal" meters, and 'was planned for the walls of stations, a strict regime of "maintenance". During guard duty at night, watch, before 7 every morning, is concerned 'to report it to the office compente any writing on the walls, which, within 48 hours, must 'clean them.

under the "decorum" and 'was also included the maintenance of some terminals, such as the activation of a walkway for the disabled in the Piramide station, which allowed the removal of barriers Architectonicly between the metro and rail B Roma Lido. Finally, elimination of odors, cleanliness and environmental awareness, the third point of the plan. Under the project, the sanitation of the convoys will be 'in fact guaranteed in just three hours with a new treatment which involves the replacement of chlorine with ozone, a gas that opportunanente treaty becomes a powerful antibacterial, for more 'anti-odor and environmentally friendly.

0 comments:

Post a Comment